Gulfstone Bath.
Services Why Us Reviews Service Areas Contact Get a Free Quote
Clearwater, FL · Tub-to-Shower Conversion

The Tub Nobody Uses Becomes the Shower Everybody Wants.

Out in the morning, waterproofed by mid-week, beautiful by Friday. Most Clearwater conversions done in 5 working days, at the flat-rate price we put in writing first.

★★★★★ 4.9 from 327 Google reviews 5-day typical timeline Lifetime workmanship warranty Financing 12-mo same-as-cash
Completed tub-to-shower conversion with zero-entry walk-in shower in Clearwater
Flat-rate, in writing Done in 5 days
See the transformation

Drag the handle to reveal the before and after.

Clearwater tub-to-shower conversion. Flat-rate quote in writing, most projects done in 5 days.

After: finished result
Before: original space
Before After
Signs it's time

That tub stopped earning its square footage years ago.

The step is a hazard

A wet 16-inch tub wall is the most dangerous step in the house, especially for knees past 50.

Zero-entry curbless option, no step at all.

Grout and grime won't quit

1980s tile with 1980s waterproofing behind it. Scrubbing can't fix what's failing underneath.

Modern waterproofing system behind every wall.

Quotes that won't commit

"Somewhere between 8 and 20 grand, depends what we find." That's not a quote, that's a shrug.

One flat-rate number, in writing, before demo.

You only have one bathroom

A three-week timeline isn't an inconvenience, it's impossible.

5 working days, shower usable on day 5.
1,100+
Conversions completed
5 days
Typical timeline
4.9★
327 Google reviews
$0
Change orders on flat-rate jobs

"They quoted my walk-in shower on a Tuesday, started the next Monday, and finished that Friday. The price never moved a dollar, and they vacuumed the hallway on their way out."

Karen D., Dunedin homeowner
Karen D.
Dunedin · Tub-to-shower conversion · Verified Google review
Licensed Residential Contractor (CRC) Insured & bonded Google Guaranteed BBB A+ Accredited

Licensed Residential Contractor (CRC) · Insured & bonded · BBB A+ accredited · Google Guaranteed

The Gulfstone Standard

Five days, one crew, one written price.

Day 0 · 60 minutes

Design it free

In-home consult, exact measurements, tile and glass samples on your counter. $0.

In hand: measurements, samples, and a plan that fits the alcove.

Within 48 hours

Quote in writing

Flat-rate price covering demo, waterproofing, tile, glass, and fixtures. It doesn't move.

In hand: one signed number. That number is the bill.

Days 1-5

Build it clean

Day 1 demo, days 2-3 waterproof and tile, day 4 glass and fixtures, day 5 finish and walkthrough.

In hand: a usable shower on day 5.

Day 5, then forever

Backed for life

Lifetime workmanship warranty on the pan, waterproofing, tile, and installation.

In hand: a written warranty that stays with the house.

Every conversion includes:

Full tear-out and haul-awayTub, surround, and old backer board gone the same day.
Modern waterproofing systemSealed membrane behind every tile, not just cement board and hope.
Tile, glass, and fixtures installedLarge-format porcelain, frameless or semi-frameless glass, your choice of trim.
Permits and final inspectionPulled and passed by us as the licensed contractor of record.
Accessibility optionsZero-entry curb, fold-down bench, grab bars, handheld heads.
Finished walk-in shower with large-format tile and frameless glass by Gulfstone Bath
Recent conversions

From "before" to "finally" in a working week.

Zero-entry shower conversion in Island Estates, Clearwater
Island Estates · Clearwater

1968 tub out, zero-entry shower in

Curbless entry, linear drain, teak bench, grab bars rated to 500 lbs.

Done in 4 days · $0 change orders
Protected hallway and dust barrier during a Gulfstone conversion
Countryside · Clearwater

One-bathroom house, zero panic

Worked around the family's schedule, shower usable every evening by day 3.

Done in 5 days · Family never left home
Master bath with new walk-in shower in Palm Harbor
Palm Harbor

Garden tub swapped for a 5-foot shower

The 1994 garden tub used twice a decade became the shower used twice a day.

Done in 5 days · Quoted $12,800, billed $12,800
Straight answers

Tub-to-shower questions, answered plainly.

How much does a tub-to-shower conversion cost in Clearwater?

Most of ours land between $9,000 and $16,000 depending on size, tile, and glass. You get one exact flat-rate number in writing before any demo, and that number is the bill.

Can I shower during the project?

On one-bathroom homes we sequence the work so the shower is usable each evening from day 3. We'll confirm the plan during your free consult.

Will it hurt resale to remove a tub?

Keep one tub somewhere in the house for resale. If this is your only tub, we'll tell you straight, and we'll quote both options so you can decide with real numbers.

Can you make it fully accessible?

Yes. Zero-entry curbless pans, fold-down benches, 500-lb-rated grab bars, handheld heads, and slip-rated tile. We build to your PT's or OT's recommendations when you have them.

Where we convert tubs

Clearwater first, and the rest of Tampa Bay with it.

City photography via Wikimedia Commons.

Take a breath. We've got it from here.

Your new shower is five days away.

Free in-home design consult, samples on your counter, and an exact price in writing. No deposit games, no surprise line items, no pressure.

$0 design consult · Flat-rate quotes in writing · 12-month same-as-cash financing · Licensed, insured & backed for life

Step 1 of 3

What does your bathroom need?

Got it. We'll call you within one business day.

Prefer not to wait? Call (727) 555-0184 now.

Related: Bathroom Remodeling Clearwater · St. Petersburg Service Area

Call Now Free Quote